48  
'RPHVWLF$LU&RQGLWLRQ
5. Purging Method:
Push the air out of the indoor unit
and piping as followes:
(1)Remove the valve cap on 2-way
    valve in outdoor unit.
(2)Loosen by 1/2 turn the flare nut of
    gas pipe, which is connected to
    3-way valve.
(3)Loosen 2-way valve by 90
o
 using
    hexagon wrench, and after approx
    6 sec tighten it up. Gas comes out
    through flare nut on wide pipe. If no
    gas is discharged, tighten flare nut
    with specified torque.
(4)Open 2-way and 3-way valves
    using specified torque.
(5)Tighten the caps on the valves
    with specified torque.
When connecting pipe exceeds 5 meters, 16g refrigerant shall be added
per exceeding meter. Charge according to the following list.
Note: When extending piping, air inside piping shall be removed by using external
         refrigerant gas, then discharge excess refrigerant by air purging.
         Brand new outdoor unit is charged 50g more refrigerant than regulated weight.
         Only for first installation, this extra 50g can be used to purge air in the pipes.
During this procedure, 50g refrigerant will be discharged in piping.
(This must be strictly controlled with 90
o
 and 6sec
Valve rod
Valve cap
Tighten torque N.m
7-9
20-25
Piping length
Additional amount
5m 7m 10m
No need 32g 80g
3-way valve
2-way valve
6.35mm(1/4")
12.7mm(1/2")
2-way valve
3-way valve
Flare nut
Gas Side
Liquid Side
6.35mm(1/4")
12.7mm(1/2")
9.52mm(3/8")
3-way valve
2-way valve
6.35mm(1/4")
9.52mm(3/8")
12.7mm(1/2")
HSU-18CK03
HSU-18CK03C
HSU-09LD03
HSU-12LD03
HSU-07LD03 HSU-07LD03C
HSU-09LD03C
HSU-12LD03C
HSU-05C03 HSU-05C03C
HSU-07C03 HSU-07C03C
Outdoor unit
+6807C03 ,QVWDOODWLRQV