No gas leakage?5.
Detach the charge hose6.
from the service port, open 2-way valve and 3-way. Turn
In case of gas leakage, tighten parts of pipe connection. If
leakage stops,
then proceed
Anti countercurrent joint
Gaugemanifold(for
R410A)
2-way valve Liquid Side
3-way valve Gas Side
Vacuum pump(for R410A)
Tube(for R410A)
Close
2-way valve
3-way valve
Open 90
O
2-way valve
3-way valve
2-way valve
3-way valve
2-way valve
3-way valve
Valve rod cap
Valve rod cap
Service port cap
To prevent the gas
leakage,
After attaching each cap, check for gas leakage around the caps.
7
.
8.
Step 1.
Step 2.
Step 3.
Step 7.
Step 6.
Step 4.
The power source must be exclusively used for air
conditioner. (Over I0A)
In the case of installing an air conditioner in a moist place,
please install an ea-
For installation in other places, use a circuit breaker as far
as possible.
Pipe cutting is carried out with a pipe cutter and burs must
be removed.
After inserting the are nut, aring work is carried out.
If the refrigerant of the air conditioner leaks, it is necessary to discharge all the
refrigerant. Vacuum rst, then
charge the liquid refrigerant into air conditioner
according to the amount marked on the name plate.
Please do not let other cooling medium, except specied one (R410A), or air
enter into the cooling circulation system. Otherwise, there will be abnormal
high pressure in the system casuing damage and possibly personal injuries.
1
Power Source Installation
2
Cutting and Flaring Work of Piping
Flare tooling die
1.Cut pipe
2.Remove burs
3.Insert the are nut
CAUTION
Flare tool for R410A Conventional are tool
Clutch-type clutch-type(Rigid-type) Wing-nut type (Imperial-type)
A
0~0.5mm
1.0~1.5mm
1.5~2.0mm
rth leakage breaker (GFCI).
4.Flare pipe
Lean
Damage of are Crack Partial Too outside
Correct Incorrect
3
On Drainage
It becomes
high midway.
The gap with the
ground is too small.
There is the bad
smell from a ditch
It waves.
The end is imm-
ersed in water.
Please install the drain hose so as to be downward slope without fail.
Please don’t do the drainage as shown below.
Please pour water in the drain pan of the indoor unit, and
is carried out surely to outdoor.
In case that the attached drain hose is in a room, please
apply heat insulation to
Less than
5cm
conrm that drainage
it without fail.
4
Check Items for Test Run
Put check mark
in boxes
Gas leak from
pipeconnecting
?
Heat insulation of
Are the connecting wirings of indoor and outdoor rmly
Is the connecting wiring of indoor and outdoor rmly xed?
Is drainage securely carried out?
Is the ground wire securely connected?
Is the indoor unit securely xed?
Is power source voltage abided by the code?
Is there any noise?
Is the lamp normally lighting?
Are cooling and heating (when in heat pump) performed normally?
Is the operation of room temperature regulator normal?
Please kindly explain to our customers how to operate
through the instruction manual.
Check for Installation and Test Run
inserted to the terminal block?
1
1+2=
kg
R410A
2
kg
2=
1=
B
C
D
F E
kg
A
This product contains fluorinated greenhouse gases covered by
the Kyoto Protocol. Do not vent into the atmosphere.
Refrigerant type:R410A
GWP* value:1975
GWP=global warming potential
Please fill in with indelible ink,
• 1 the factory refrigerant charge of the product
• 2 the additional refrigerant amount charged in the field and
• 1+2 the total refrigerant charge
on the refrigerant charge label supplied with the product.
The filled out label must be adhered in the proximity of the product
charging port (e.g. onto the inside of the stop valve cover).
A contains fluorinated greenhouse gases covered by the Kyoto
Protocol
B factory refrigerant charge of the product: see unit name plate
C additional refrigerant amount charged in the field
D total refrigerant charge
E outdoor unit
F refrigerant cylinder and manifold for charging
Contains fluorinated greenhouse gases
covered by the Kyoto Protocol
Refrigerant charge label
the valve stem counterclockwise.
step 6. If leak continues, remove the refrigerant used for the
leakage check and flare tubes again. Repeat vacuum and leak and if no
leakage, proceed to step 6.
replace the service port and valve stem caps securely.
pipeconnecting
?
0~1/51 inch
3/76 ~1/17 inch
1/17 ~1/8 inch