Spray ball
09513, 09514, 09515, 09516, 09517
BA_009500.03_EN
2019-03-05 Albert Handtmann Armaturenfabrik GmbH & Co. KG 6 / 6
4.2 Operation
Pos: 15 /Technische Dokumentation/Betriebsanleitungen/Montage, Betrieb, Wartung/Betrieb/09500/Betriebshinweise 95000 @ 4\mod_1551779581698_20.docx @ 34628 @ @ 1
CIP:
Tank diameter should be smaller than the spray circle diameter.
Chose spray ball capacity from the table.
Liquid pressure at the spray ball 1,5 - 2,0 bar.
Cleaning time depending on contamination level.
Cleaning temperatures acc. to operating conditions.
Draining of the detergents has to be guaranteed.
WARNING
Warning General dangers!
Splash hazard by caustic, acid and other media
Do not open tank/vessel during CIP.
Pos: 16 /Techni sch e Dokum entati on/Ü bersc hrift en/1. 1/War tungs hinwei se @ 0\mod_1215765605303_20.docx @ 653 @ 2 @ 1
4.3 Maintenance
Pos: 17 /Techni sch e Dokum entati on/Be trie bsanl eitung en/M ontag e, Betr ieb, War tung/ Wart ung/ 95000/ Wart ung 950 00 @ 4\mod_1551780417185_20.docx @ 34637 @ @ 1
Basically, the spray balls are maintenance-free (material stainless steel)
CAUTION
Caution damage to components!
However, due to mineral sediments or insufficient water quality, a reduction of the bore
hole cross sections is possible.
Any maintenance only at depressurized system.
Maintenance if necessary, at least once a year.
During maintenance pay attention to the assembly and safety instructions.