Spray ball
09513, 09514, 09515, 09516, 09517
BA_009500.03_EN
2019-03-05 Albert Handtmann Armaturenfabrik GmbH & Co. KG 6 / 6
4.2 Operation
Pos: 15 /Technische Dokumentation/Betriebsanleitungen/Montage, Betrieb, Wartung/Betrieb/09500/Betriebshinweise 95000 @ 4\mod_1551779581698_20.docx @ 34628 @ @ 1
CIP:
• Tank diameter should be smaller than the spray circle diameter.
• Chose spray ball capacity from the table.
• Liquid pressure at the spray ball 1,5 - 2,0 bar.
• Cleaning time depending on contamination level.
• Cleaning temperatures acc. to operating conditions.
• Draining of the detergents has to be guaranteed.
WARNING
Warning – General dangers!
Splash hazard by caustic, acid and other media
– Do not open tank/vessel during CIP.
Pos: 16 /Techni sch e Dokum entati on/Ü bersc hrift en/1. 1/War tungs hinwei se @ 0\mod_1215765605303_20.docx @ 653 @ 2 @ 1
4.3 Maintenance
Pos: 17 /Techni sch e Dokum entati on/Be trie bsanl eitung en/M ontag e, Betr ieb, War tung/ Wart ung/ 95000/ Wart ung 950 00 @ 4\mod_1551780417185_20.docx @ 34637 @ @ 1
Basically, the spray balls are maintenance-free (material stainless steel)
CAUTION
Caution – damage to components!
However, due to mineral sediments or insufficient water quality, a reduction of the bore
hole cross sections is possible.
– Any maintenance only at depressurized system.
– Maintenance if necessary, at least once a year.
– During maintenance pay attention to the assembly and safety instructions.
=== Ende der Lis te f ür T e xtmar ke I nhal t == =