4.1
4 - Sprayer setup
General info
Unloading the sprayer from the truck
For the unloading of the sprayer, you need a crane. When unloading
with a crane please observe the lifting points as shown on the picture,
and make sure that the straps or belts used for lifting are strong enough.
ī
ATTENTION! Only lift the sprayer when the tanks are empty!
Pulling the sprayer at the tie down hooks
For moving the sprayer or loading it to e.g. a truck, it can be pulled in the
hooks at the rear-end (A) or a hook can be fastened into the h
ole in the
front end of the sprayer (B).
Before putting the sprayer into operation
Although the sprayer has been applied with a strong and protective surface treatment on steel parts, bolts etc. in the factory,
it is recommended to apply a film of anticorrosion
oil (e.g. CASTROL RUSTILO or SHELL ENSIS FLUID) on all metal parts in
order to avoid chemicals and fertilizers discoloring the enamel. If this is done before the sprayer is put into operation for the
first
time, it will always be easy to clean the sprayer and keep the enamel clean for many years. This treatment should be
carried out every time the protection film is washed off.
Support jack
The support jack is stored in the bracket on the sprayerās right side when
the sprayer is attached to the tractor. To use the support jack: Lift the jack
off the storage bracket. Th
e suppor t jack can then be mounted to the
drawbar extension on either side as preferred and secured by a linch pin.
To remove the support jack: Lift the jack, remove the linch pin and pull
out the support jack. Se
cure the jack at the storage bracket with the
linch pin.