EQUIPEMNT AND TOOLS FOR INSTALIATION
1. Measuring tape
2. String for alignment
3. Step ladder
4. Welder
5. Sledge hammer
6. Wrench
7. Scissors
INSTALLATION PROCESS
A—FRAME INSTALLATION
Figure 1
There are four base plate comes with the back endwall. Each of them should be placed in the
right position(especially the two base plate close to the containers.)
1. The measure is from center to center of the tubes. Referring to the above diagram.
2. As the Figure 2 Shows, please find all the parts accordingly.