EasyManuals Logo

Hatz 2-4L41C Instruction Book

Hatz 2-4L41C
81 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #24 background imageLoading...
Page #24 background image
27
Depending on engine type and version, one of
the three self-adhesive maintenance charts illus-
trated here and on the previous page will be
supplied. It should be attached to the engine or
equipment at a point where it is clearly visible.
Comply with the maintenance intervals stated in
the maintenance summary in this chapter
The following work is essential on new or
reconditioned engines after the first 25 hours
of operation:
– Change the engine oil and renew the oil filter
element (Chapter 5.3.1. and 5.4.5.).
– Check valve clearances and adjust if neces-
sary(Chapter 5.4.3.).
– Check tightness of all screw connections
(Chapter 5.3.3.).
Do not take up slack at cylinder head bolts.
If the engine has not been operated for long
periods at a time, change the oil and renew the
filter element after a maximum of 12 months,
regardless of how many operating hours have
been recorded.
23

Other manuals for Hatz 2-4L41C

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Hatz 2-4L41C and is the answer not in the manual?

Hatz 2-4L41C Specifications

General IconGeneral
BrandHatz
Model2-4L41C
CategoryEngine
LanguageEnglish

Related product manuals