EasyManua.ls Logo

Heathkit HM-2102 - Page 12

Heathkit HM-2102
26 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Gaeguearixkite
(_
)
Connect
the
red
wire
between
the
positive
meter
lug
(S-2)
and
lug
1
of
switch
AD
(S-1).
(_
)
Connect
the
white
wire
between
lug
3
of
switch
AC
(S-1)
and
lug
2
of
switch
AD
(S-1).
(
)
Connect
the
black
wire
between
the
negative
meter
lug
(NS)
and
solder
lug
AA
(S-1).
CUT
TO
SPECIFIED
LENGTH
on
3"
*
1/2"
CABLE
1/4"
<—
Bikohod
an
%
NOTE:
REMOVE
1/2"
OF
INSULATION
FROM
EACH
WIRE
ON
THIS
END.
Detail
4E
(_
)
Refer
to
Detail
4E
and
prepare
both
ends
of
the
long
cable
as
shown.
Twist
the
bare
wire
ends
tightly
and
apply
a
small
amount
of
solder
to
each
end
to
hold
the
smalj
strands
together.
Connect
the
3”
prepared
end
of
this
cable
to
the
cabinet
components
in
the
following
steps.
(_
)
Connect
the
black
wire
to
the
negative
(unmarked)
meter
lug
(S-3).
(_
)
Connect
the
brown
wire
to
lug
3
of
switch
AD
(S-1).
Ya,
Va
Oo
4”
2”
Paga
9
(_
)
Connect
the
green
wire
to
lug
4
of
switch
AD
(S-1).
(_
)
Connect
the
red
wire
to
lug
4
of
switch
AC
(S-1).
(
)
Connect
the
white
wire
to
lug
6
of
switch
AC
(S-1).
(
)
Place
a
cable
clamp
on
the
cable
so
that
1"
of
the
outer
insulation
extends
beyond
the
clamp
as
shown
in
Detail
4F.
Secure
the
clamp
to
the
chassis
at
AB
with
a
6-32
x
3/8"
screw,
a
D
washer,
a
#6
lockwasher,
and
a
6-32
nut.
(
)
Remove
and
discard
the
shorting
wire
from
the
meter
terminals.
S
6-32
NUT
&
#6
LOCKWASHER
D
WASHER
|
U
6-32
x
3/8"
SCREW
Detail
4F
5”’
6”
SE
(NS

Related product manuals