EasyManua.ls Logo

Heathkit IB-5281 - Page 34

Heathkit IB-5281
65 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page
32
ee
Ge
gurasrHxitT?
a
DIAL
CALIBRATION
Refer
to
Pictorial
4-4
for
the
following
steps.
Preset
the
front
panel
controls
as
follows:
(4
BALANCE
control
R26
fully
counterclockwise.
RANGE
switch
to
RX1.
LEVEL
control
fully
counterclockwise.
Plug
both
alligator
clips
into
the
Z,
terminals.
Locate
the
100
0
(brown-black-brown)
resistor
which
was
left
over,
and
install
it
between
the
two
alligator
clips
as
shown.
Place
the
POWER
switch
to
ON.
The
meter
ah
wild
oxatenn
fall
eenle
than
denn
hacrl
teerarde
Snoulra
SW1U8
TULL
SCALE,
LILETL
GL
op
VaACK
LOWd1
US
0.
Gradually
increase
the
LEVEL
control
until
the
meter
reads
10.
SO
LX
tuH
300
350)
RX10K
Rx100
HEATHEIT
ALC
BRIDGE
RANGE
LX
1mH
Lx
OH
CM
1pF
VN
GS
Rx1
GY
zr—Ws
(LY)
MODEL
18-5281
CX
0001
uF
Cx
O1UF
Increase
the
LEVEL
control
fully
clockwise,
rock
the
BALANCE
control
back
and
forth
a
few
_
times
to
obtain
the
best
null
possible.
Very
carefully,
loosen
the
setscrew
on
the
ba-
lance
control
knob
without
moving
the
control.
Position
the
dial
pointer
so
it
is
over
the
100
mark
on
the
A
scale.
Tighten
the
setscrew.
Check
the
null
on
the
meter
and
make
sure
the
pointer
is
directly
over
the
“100”
mark.
If
it
is
not,
repeat
the
previous
step.
Turn
the
LEVEL
control
terclockwise.
fully
coun-
Return
the
POWER
switch
to
OFF.
Disconnect
the
100
2
resistor
and
remove
the
alligator
clips
from
the
front
panel
terminals.
Note:
Save
the
resistor
in
case
you
would
like
to
recalibrate
your
unit
later.
le.
I
Supply,
disconnect
it
from
This
completes
the
‘Dial
Calibration.”
Proceed
to
“Final
Assembly.”