EasyManua.ls Logo

Heinner HCNF-M295XA+ - Before Using; Cleaning Before Use; Initial Unit Operation

Heinner HCNF-M295XA+
104 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
www.heinner.com
11
4. DOOR SPACE REQUIREMENTS
The units door must be able to open fully as shown.
5. LEVELLING THE UNIT
To do this adjust the two levelling feet at the front of the unit. If the unit is not
level, the door and magnetic seal alignments will not be covered properly.
Make sure that the foot touches the ground before use.
Look down from the top, clockwise and counterclockwise loosening, tightening.
W x D ≥ 990x 1025 mm
W

Related product manuals