Operating instructions
pelletstar 10 60

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Herz pelletstar 30 and is the answer not in the manual?

Summary

Introduction

Safety Notes

Warning Notes

Highlights critical safety warnings and risks associated with system handling and operation.

Installation

Details general notes and requirements for the proper installation of the heating system.

Operation and Maintenance

Covers general guidelines for safe operation and essential maintenance procedures.

Fuels

Wood Pellets

Specifies the required properties and quality standards for wood pellets used in the boiler.

System

Equipment Functioning

Feeder System

Explains the process of fuel transport from the storage room to the combustion chamber.

Type of Feed

Describes how the pelletstar system controls fuel feeding based on pulse-no-pulse ratios.

Combustion Air Control

Details the differentiation and supply of primary and secondary air for combustion.

Removing the Two Ash Pans

Provides instructions for removing ash pans, specifying model applicability.

Boiler Operation

Covers automatic ignition and operation based on heat requirements.

Safety Devices

Outlines essential safety devices and adherence to relevant regulations.

Start-up

Describes the procedure for initial system start-up and operator handover.

Operating Temperatures and Impermissible Temperatures

Discusses normal operating temperatures and limits to prevent damage and ensure safety.

Operating Conditions

Heating Off

Describes the system state when it is switched off and the burner is blocked.

Ready

Indicates the condition where temperatures are sufficient for loads.

Prepare Ignition

Refers to the state where the grate is cleaned and the lambda probe is pre-heated.

Pre-Ventilate

Explains the process of flushing the combustion chamber and chimney with air.

Cold Start

Details the start-up procedure for low boiler room temperatures.

Scorch Phase

Describes the phase for achieving an even fire bed with higher oxygen.

Run Up Phase

Covers operation at rated output until the boiler temperature is reached.

Control Phase

Explains the boiler's modulation between nominal and partial load.

Burn Out Phase

Describes the process of burning residual fuel after shutdown.

Burner Cleaning

Outlines the procedure for cleaning the burner plate.

Heatexchanger Cleaning

Details the automatic cleaning of the heat exchanger for efficiency.

Output Control

Explains how boiler output is regulated based on temperature settings.

Flue Gas Temperature Control

Describes output reduction if flue gas temperature exceeds limits.

Flame Monitoring

Covers detection of combustion fluctuations and system shutdown.

Frost Protection

Explains the system's measures to prevent freezing during low temperatures.

Lambda Control

Describes optimization of combustion via material and ventilator control.

Temperature Manager

Description of the Menu Navigation System and Settings

Starting the System

Details the procedure to power on the display and initiate system start-up.

Main Menu

Presents the primary screen displaying key operational values and system status.

Operation and Handling

Guides users on how to interact with the touch panel interface for system control.

Explanation of the Symbols

Defines and clarifies the meaning of various symbols used within the menu system.

Code - Entry

Explains the process of entering access codes for changing settings or unlocking features.

Switching the Boiler On and Off

Provides instructions for the safe and correct procedure to turn the boiler system on and off.

Selecting Date and Time

Covers methods for setting the system's date and time, including NTP synchronization.

Determining Values for the Main Menu

Describes how to customize the main menu by selecting which values to display.

Deleting Display Values from the Main Menu

Explains the process for removing specific data points from the main menu display.

Fault Messages and Warnings

Details how to interpret and respond to system fault reports and warning indicators.

Modules

Provides an overview of the different system modules accessible through the menu interface.

Fault Reports and their Correction

Faults not indicated on the display (Maintenance)

Addresses troubleshooting for issues not flagged by system error messages, focusing on maintenance.

Maintenance Schedule (Customer Inspection)

Outlines recommended maintenance tasks and their intervals for routine customer checks.

EC Declaration of Conformity

Annex

Functioning of the Operation Mode Screed drying

Explains the specific operational sequence and temperature profiles for screed drying.

Notes

Herz pelletstar 30 Specifications

General IconGeneral
BrandHerz
Modelpelletstar 30
CategoryBoiler
LanguageEnglish