Do you have a question about the Herz pelletstar 30 and is the answer not in the manual?
Highlights critical safety warnings and risks associated with system handling and operation.
Details general notes and requirements for the proper installation of the heating system.
Covers general guidelines for safe operation and essential maintenance procedures.
Specifies the required properties and quality standards for wood pellets used in the boiler.
Explains the process of fuel transport from the storage room to the combustion chamber.
Describes how the pelletstar system controls fuel feeding based on pulse-no-pulse ratios.
Details the differentiation and supply of primary and secondary air for combustion.
Provides instructions for removing ash pans, specifying model applicability.
Covers automatic ignition and operation based on heat requirements.
Outlines essential safety devices and adherence to relevant regulations.
Describes the procedure for initial system start-up and operator handover.
Discusses normal operating temperatures and limits to prevent damage and ensure safety.
Describes the system state when it is switched off and the burner is blocked.
Indicates the condition where temperatures are sufficient for loads.
Refers to the state where the grate is cleaned and the lambda probe is pre-heated.
Explains the process of flushing the combustion chamber and chimney with air.
Details the start-up procedure for low boiler room temperatures.
Describes the phase for achieving an even fire bed with higher oxygen.
Covers operation at rated output until the boiler temperature is reached.
Explains the boiler's modulation between nominal and partial load.
Describes the process of burning residual fuel after shutdown.
Outlines the procedure for cleaning the burner plate.
Details the automatic cleaning of the heat exchanger for efficiency.
Explains how boiler output is regulated based on temperature settings.
Describes output reduction if flue gas temperature exceeds limits.
Covers detection of combustion fluctuations and system shutdown.
Explains the system's measures to prevent freezing during low temperatures.
Describes optimization of combustion via material and ventilator control.
Details the procedure to power on the display and initiate system start-up.
Presents the primary screen displaying key operational values and system status.
Guides users on how to interact with the touch panel interface for system control.
Defines and clarifies the meaning of various symbols used within the menu system.
Explains the process of entering access codes for changing settings or unlocking features.
Provides instructions for the safe and correct procedure to turn the boiler system on and off.
Covers methods for setting the system's date and time, including NTP synchronization.
Describes how to customize the main menu by selecting which values to display.
Explains the process for removing specific data points from the main menu display.
Details how to interpret and respond to system fault reports and warning indicators.
Provides an overview of the different system modules accessible through the menu interface.
Addresses troubleshooting for issues not flagged by system error messages, focusing on maintenance.
Outlines recommended maintenance tasks and their intervals for routine customer checks.
Explains the specific operational sequence and temperature profiles for screed drying.