This operator’s manual is an Original Instruction
and applies for cranes from serial number:
BL013000001, BL018000001, BL023000001, BL029000001, BL038000001
2016-04
Operator's Manual GB
HIAB T-HiDuo
013/018/023/029/038 CE

Table of Contents

Questions and Answers:

HIAB T-HiDuo 029 CE Specifications

General IconGeneral
BrandHIAB
ModelT-HiDuo 029 CE
CategoryConstruction Equipment
LanguageEnglish

Summary

Safety Precautions and Warnings

Maximum Load

Explains lifting capacity, load moment, and the importance of the load plate.

Maximum Load Moment

Defines maximum load moment and OLP situations related to load capacity.

Use of the Crane

Covers essential safety precautions for starting crane operation.

Preparations for Use

Outlines necessary preparations before operating the crane, including safety.

The Safety System

Safety System SPACE 4000 and Remote Control

Overview of the SPACE 4000 safety system and its remote control capabilities.

How the Safety System Works

Explains the operational logic of the safety system using sensors and a microprocessor.

XSDrive Lite Controller

Describes the controller's components: levers, menu selection, OLP release, horn, manual extensions, speed selection, channel shift, stop button.

Remote Control XSDrive Lite with Radio

Explains the transmitter and receiver for the radio remote control operation.

Starting Crane Operation

Starting Operations

Covers initial steps like placing the vehicle, engaging PTO, and starting the safety system.

Extend Stabiliser Extensions and Set Stabiliser Legs

Details the procedure for extending and setting stabiliser legs for full capacity and stability.

During Operation

OLP (Overload Protection)

Explains the Overload Protection function, warnings, and automatic stops.

Ending Crane Operation

Operate the Crane to Parking Position

Instructions for retracting extensions, folding the hook, and lowering the boom to park.

Placing the Stabiliser Legs in the Transport Position

Details on retracting and securing the stabiliser legs for transport.

Emergency Operation Main Control Valve

Describes the highly dangerous emergency operation procedure for bringing the crane to park.

Maintenance and Service

Service

General advice on service, welding, drilling, and crane reinstallation.

Follow the Maintenance Instructions!

Emphasizes adherence to maintenance schedules and supplier instructions.

Daily Inspection

Checklist for daily inspections of stabiliser locks, shafts, stop buttons, and hooks.

Monthly Inspection and Maintenance

Additional checks for monthly maintenance, including piston rods, decals, and pivot pins.

Check Rope

Guidelines for inspecting the hoist rope for damage and determining when to discard it.

Troubleshooting

General introduction to troubleshooting faults detected by the microprocessor.

Faults on the Crane

Lists common crane faults, their probable causes, and recommended actions.

Faults in the Hoist

Troubleshooting guide for hoist issues like not hoisting or holding the load.