HISON WATERCRAFT
9
3. New Crosski Break-in
Long-run if you perform the following guidelines:
1. Start the Crosski and let the engine warm up at idle for approximately 5-10 minutes.
2. Throttle at a moderate to fast idle below 2000 RPM for 10 minutes.
3. Ride the Crosski using various engine speeds.
Engine running procedure (first 10 hours)
Do not exceed 50% sustained throttle opening for the first five hours of engine running, and
75% throttle opening for next five hours.
Vary engine speed regularly during this time, and brief 5-10 second periods of acceleration
are permitted for getting on plane and to change speed.
Do not labor or overload engine.
Include at least two hours water running in the 10 hours.
Note: After the first 10 hours of running, the air cleaner should be checked and the oil filter
replaced.
Pre-ride Inspection
Always perform a pre-ride inspection before each use to make sure the Crosski is in a safe
operating condition. The pre-ride inspection can also help you monitor wear and deterioration
before they become a problem as well as identify and correct any problems that could make
the Crosski hazardous to operate (for example, debris or ice interfering with operation of
controls). Before riding, correct any problems that you discover to reduce the risk of a
breakdown or crash. Contact a Hison dealer as necessary.
Note: start the pre-ride inspection with the Crosski on land the engine off and engine safety
cut-off removed.