'UDLQDJHDQGZDWHUOHDNDJHFKHFN
After performing drain piping work and the electrical wiring and
EHIRUHLQVWDOOLQJWKHDLUSDQHOFKHFNWRHQVXUHWKDWZDWHUÀRZV
smoothly according to the following procedure.
• 'UDLQDJHRSHUDWLRQE\ÀRDWVZLWFK
7KHIROORZLQJLVUHJXODUSURFHGXUHWRFKHFNWKHÀRDWVZLWFK
operation.
a. Turn ON the power supply.
E Pour 1500cc to 2000cc of water gradually into the drain
pan.
c. &KHFNWRHQVXUHWKDWWKHZDWHUÀRZVVPRRWKO\LQVLGHWKH
transparent drain pipe and drained at the pipe end, and
that no water leakage occurs.
d. If the end of the drain pipe cannot be checked visually,
pour another 1500 ~ 2000cc of water to the drain pan.
,IWKHZDWHURYHUÀRZVIURPWKHGUDLQSDQWKHUHPLJKW
be some failure inside the drain pipe. Recheck the drain
pipe.
Vinyl tape
(Gray)
Position for checking drainage
for checking drainage
(Transparent)
Drain hose
(Accessory)
Pouring water through air outlet
Pump
Water
(1500 to 2000cc)
Drain pan
Insert the end of the
hose between the
KHDWH[FKDQJHUDQG
the drain pan and
bend it down
Bucket
C A U T I O N
%HFDUHIXOWKDWZDWHUGRHVQRWVSODVKRQWKHHOHFWULFDOSDUWVVXFKDVWKH
IDQPRWRUÀRDWVZLWFKRUWKHUPLVWRUV
6LPSOLÀHG2SHUDWLRQRI'UDLQXS0HFKDQLVP
7KHIROORZLQJLVWKHVLPSOL¿HGRSHUDWLRQSURFHGXUHRIWKHGUDLQ
up mechanism.
a. Turn OFF the power supply.
E Disconnect the service connector (marked with green).
c. 7XUQ21WKHSRZHUVXSSO\DQGVWDUWWKHVLPSOL¿HG
operation of the drain-up mechanism.
d. Turn OFF the power supply.
e. Reconnect the service connector.
N O T E
0DNHVXUHWRKROGWKHFRQQHFWRUSDUW'RQRWWDNHRXWDQGSOXJLQ
WKHFRQQHFWRUIUHTXHQWO\PRUHWKDQRUWLPHV
Drain-up, mechanism service
connector (marked with green)
Terminal block
Indoor unit
(OHFWULFDOER[
Air panel
PCB
C A U T I O N
7XUQ 2)) WKH SRZHU VXSSO\ ZKHQ KDQGOLQJ WKH VHUYLFH FRQQHFWRU
2WKHUZLVHLWPD\FDXVHDQHOHFWULFVKRFN
Insulate the drain pipe after connecting the drain hose. Do not
use adhesive between the drain pipe connection and the drain
hose.