EasyManua.ls Logo

Hitachi RPI-20.0FSN3PE User Manual

Hitachi RPI-20.0FSN3PE
756 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
SET FREE SERIES
FSXN1E
FSXNH(E)
INSTALLATION AND OPERATION MANUAL
MANUAL DE INSTALACIÓN Y FUNCIONAMIENTO
INSTALLATIONS- UND BETRIEBSHANDBUCH
MANUEL D’INSTALLATION ET DE FONCTIONNEMENT
MANUALE D’INSTALLAZIONE E D’USO
MANUAL DE INSTALAÇÃO E DE FUNCIONAMENTO
INSTALLATIONS- OG BETJENINGSVEJLEDNING
INSTALLATIE- EN BEDIENINGSHANDLEIDING
INSTALLATION- OCH DRIFTHANDBOK
ΕΓΧΕΙΡΙΔΙΟ ΕΓΚΑΤΑΣΤΑΣΗΣ ΚΑΙ ΛΕΙΤΟΥΡΓΙΑΣ
PMML0294A_rev.2_02-2014.indb 1 14/07/2014 12:27:46
Question and Answer IconNeed help?

Do you have a question about the Hitachi RPI-20.0FSN3PE and is the answer not in the manual?

Hitachi RPI-20.0FSN3PE Specifications

General IconGeneral
Cooling Capacity (kW)20.0
Heating Capacity (kW)22.4
Power SourceElectric
RefrigerantR410A
Outdoor Unit Noise Level56 dB(A)
TypeSplit Type
Power Supply3-Phase 380-415V 50Hz

Summary

GENERAL INFORMATION

SAFETY

Information on safety precautions and symbols used.

Additional information about safety

Further safety details including electrical shock and high pressure risks.

Pressure vessel and safety device

Information on high pressure vessel and safety device.

UNIT INSTALLATION

PRELIMINARY CONDITIONS FOR POSITIONING OF OUTDOOR UNIT

Conditions for optimal outdoor unit placement regarding sunlight, temperature, and noise.

PIPING WORK AND REFRIGERANT CHARGE

REFRIGERANT PIPE SELECTION

Guidelines for selecting correct refrigerant pipe sizes.

Refrigerant pipe selection

Instructions for selecting pipe sizes based on unit and system type.

Copper pipes, sizes, connection and insulation

Details on copper pipe specifications, connection, and insulation.

General instructions on the installation of refrigerant pipes

General guidelines for installing refrigerant pipes, including flared connections.

Refrigerant pipe connection for heat pump systems (2 pipes) and heat recovery systems (3 pipes)

Pipe connection details for heat pump and heat recovery systems.

ADDITIONAL REFRIGERANT CHARGE

AIR-TIGHT TEST

Procedure for performing the air-tight test on refrigerant piping.

ADDITIONAL REFRIGERANT CHARGE CALCULATION

Method for calculating additional refrigerant charge based on piping.

VACUUMING

Steps for vacuum pumping the refrigerant system.

CHARGING WORK

Procedure for charging additional refrigerant into the system.

Special attention regarding refrigerant gas leakage

Information on critical gas concentration and ventilation requirements.

Precautions in the event of refrigerant leaks

Safety precautions and concentration limits for refrigerant leaks.

ELECTRICAL WIRING

GENERAL VERIFICATIONS

Checks for electrical components, supply voltage, and wiring standards.

CONNECTION OF THE POWER SUPPLY CIRCUITS

Diagrams for connecting power supply circuits to outdoor and indoor units.

ELECTRICAL WIRING FOR OUTDOOR UNIT

Instructions for connecting electrical wiring to outdoor units.

TEST RUN

PRELIMINARY CHECKS

Essential checks before performing the test run.

CARRY OUT THE TEST RUN

Steps for executing the test run procedure.

ALARM CODES

CONTROL AND SAFETY DEVICES

BASIC TROUBLESHOOTING

Related product manuals