EasyManua.ls Logo

Honda 2005 CB900F User Manual

Honda 2005 CB900F
18 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Set-up and pre-delivery service
must be performed by an authorized
Honda motorcycle dealer.
2005 CB900F
SET-UP
INSTRUCTIONS
©2005 American Honda Motor Co., Inc. - All Rights Reserved
MPD 10969 (0501)
Issued: March 2005
Question and Answer IconNeed help?

Do you have a question about the Honda 2005 CB900F and is the answer not in the manual?

Honda 2005 CB900F Specifications

General IconGeneral
Displacement919 cc
Compression Ratio10.8:1
Cooling SystemLiquid-cooled
IgnitionComputer-controlled digital transistorized with electronic advance
Transmission6-speed
Final DriveO-ring-sealed chain
Rear BrakesSingle 240 mm disc with single-piston caliper
Wheelbase57.5 inches
Fuel Capacity5.0 gallons
Curb Weight485 pounds
Bore x Stroke71.0 mm x 58.0 mm
Fuel SystemPGM-FI fuel injection
Front Suspension43mm HMAS cartridge fork with spring preload adjustability; 4.7 inches travel
Rear SuspensionSingle shock with spring-preload adjustability; 5.0 inches travel
Front BrakesDual 296mm discs with 4-piston calipers
Front Tire120/70ZR-17
Rear Tire180/55ZR-17
Engine TypeInline four-cylinder, DOHC, 16-valve

Summary

Safety and Introduction

Customer Safety

Essential for rider safety and machine reliability; errors can cause faulty operation or injury.

Technician Safety

Follow all instructions and precautions carefully to avoid serious injury or death.

Important Safety Precautions

Understand shop safety, wear appropriate gear, ensure firm support, keep engine off, avoid hazards.

Crate Removal and Initial Component Installation

Remove Carton Cover and Check for Damage

Remove crate components and inspect motorcycle for any hidden damage.

Crate Frame and Loose Parts

Remove Crate Frame and Loose Parts Carton

Lift off crate frame, remove parts carton, and set aside manual.

Handlebar and Control Assembly

Handlebar Components and Switches

Clutch Lever and Crate Removal

Remove Motorcycle from Crate Base

Route slings under steering stem and through rear wheel for lifting.

Final Crate Disassembly and Storage

Remove Motorcycle from Crate Base (cont.)

Remove crate shipping braces, install footpeg brackets, torque bolts, and clean brake discs.

Cable, Hose, and Wire Harness Checks

Battery Installation and Checks

Service and Install Battery

Install battery if sold or for demonstration, connect cables, and secure hold-down strap.

Controls and Adjustments

Lever Adjustments and Brake Light

Fluid Level Checks

Check Engine Oil

Check oil level via window, add recommended oil if low, and verify level after running engine.

Check Coolant Level

Check coolant level in the reserve tank and add appropriate coolant if needed.

Final Checks and Completion

Related product manuals