cno '80 ADDENDUM
IX. SHOCK ABSORBER
DISASSEMBLY
l. Remove the shock absorber assembly
by
loosen-
ing
the upper a
ndlowercapnuts.
2.
Rcmovetheupperjoint.
2.
lNSPECTION
Measur
e the shock absorber spring free length.
SERVI
CE
LIMIT
:
195
mm
(7.68 in)
J. ASSEMBLY
I.
Install the spring seat, stopper rubber and lock
NOTE
• Install the
spring
with the narrow pitch end
on
the upper joint side .
• Apply
LOCTITE. to the Jock nut before instal-
lation.
Install and tighten the upper joint.
3. Install the shock absorber with the cap nuts.
TORQUE S
PE
C
IFI
CA
TI
ON
3.0- 4.0
kg-m
(22-29
ft•lb)
X.
CHAIN
GUIDE
CONSTRUCTION
The 1980
CTT0
has
a chain guide whlch
is
installed
on the
swing
ann
as
shown.
SHOCK ABSORBER DISASSEMBLY
TOOL
07959-3290001
~
UPPER
JOINT
~
® LOCK NUT
109