EasyManua.ls Logo

Hotpoint RLM30 User Manual

Hotpoint RLM30
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
LARDER FRIDGE - MODELS RLA30, RLM30, RLS30, RLA32
INSTRUCTIONS FOR INSTALLATION & USE
GETTING STARTED:
To ensure that your fridge runs reliably and efficiently follow these steps.
Choose a location for your
fridge, away from any
heat sources and
allow adequate
ventilation - 30mm
(1
1
/4 inch) gap above.
Level the fridge by
adjusting the front feet.
This will stop rocking or
vibration and keep the
door aligned.
Plug in and switch on.
Allow the fridge to cool
before placing food
inside.
All food in the fridge
should be covered.
Move the fridge into
position, using the sides
of the cabinet. Take care
to avoid damaging the
refrigerant circuit pipe
work on the rear.
Before plugging in and
switching on, leave the
fridge in its final
location for at least 15
minutes to allow it to
settle.
Your fridge is now
working.
If after 24 hours your
fridge is not operating as
you want, refer to the
Troubleshooting section.
Read the rest of these instructions to get the best from your appliance
and remember to fill in your guarantee registration.
Keep this Book in a safe place for quick reference.
STEP 1 STEP 2
STEP 3 STEP 4
STEP 5 STEP 6
SAFETY &
INSTALLATION CONTROLS
USEFUL ADVICE
CLEANING &
MAINTENANCE
SERVICE &
GUARANTEE
TROUBLESHOOTING
Question and Answer IconNeed help?

Do you have a question about the Hotpoint RLM30 and is the answer not in the manual?

Hotpoint RLM30 Specifications

General IconGeneral
TypeFreestanding
Energy RatingA+
Weight60 kg
ColorWhite
Number of Shelves4
Defrosting SystemManual

Summary

GETTING STARTED

STEP 1: Choose a location

Instructions for selecting the optimal placement for your fridge, away from heat sources.

STEP 2: Move the fridge into position

Guidance on safely moving the appliance into its final location, avoiding damage to rear pipes.

STEP 3: Level the fridge

Steps to ensure the fridge is stable and door aligns correctly by adjusting the front feet.

STEP 4: Allow the fridge to settle

Recommendation to let the fridge stand for 15 minutes before plugging in to allow it to settle.

STEP 5: Plug in and switch on

Instructions for connecting the appliance to power and initial cool-down before storing food.

For Your Safety

When installing your fridge

Safety advice regarding mains cable placement and avoiding stacking other appliances on top.

When using your fridge

Safety precautions for operating the appliance, including not storing dangerous substances.

Installation

Location & Air Circulation

Guidance on placing the fridge away from heat sources and ensuring proper ventilation gaps.

Levelling

Instructions on how to level the fridge using front feet for stability and efficient operation.

Electrical Supply

Requirements for earthing the appliance and ensuring the plug is accessible after installation.

Minimum space required to open door

Information on the necessary clearance for opening the fridge door fully and side gaps.

Fitting a Fridge under a Work Top

Advice on ventilation requirements, including fitting a vent, when installing under a worktop.

Controls

Defrosting and Cleaning

Maintenance

Door Reversal

Detailed procedure for reversing the door hinge to change the opening direction.

Troubleshooting

The appliance will not work

Steps to diagnose and resolve issues when the fridge is not functioning, checking power and connections.

Hotpoint guarantee

Related product manuals