23
The ES47 comes in a single cabinet with one or two 2P drawers.
1. Unpack and de-skid the system.
2. Roll the cabinet to the desired location.
3. Level the system using the four leveling feet at the bottom four corners of
the cabinet. Lower the leveling feet until the castor in each corner are free
to rotate and the feet, not the castors, support the weight of the cabinet.
At the rear of each cabinet you will find an extension bar with two non-
load-bearing leveling feet - they should be lowered until they make contact
with the floor.
4. All cable connections should be made in a single cabinet system. Check
to make sure that cables are secure.
5. There are two shipping brackets at the front that secure the 2P drawers to
the cabinet’s side rails. On each side, remove the screw that secures the
drawer to the bracket.
6. There are two orange shipping brackets at the back that secure the I/O
drawers to the cabinet’s side rails. On each side, remove the brackets
and screws; save them with the system for use later should the system be
moved.
7. Choose the console connection the customer has selected from the
following possible connections.
ES47 Cabinet with 4 Separate Systems Using a PC
ES47 Cabinet with 4 Separate Systems Using a VGA
ES47 Cabinet with 4 Separate Systems Using an AMS
ES47 Cabinet with 4 Separate Systems Using the serial line
ES47 Cabinet with single M4 System Using a PC
ES47 Cabinet with single M4 System Using an AMS
8. Verify the installation.