49
1. You should already have determined the location of the expander cabinet
relative to other cabinets making up the system.
2. Remove the panel, either right or left of both the expander cabinet and its
neighbor.
3. Roll the expander cabinet as close as possible to its neighboring cabinet
and align the front and rear surfaces.
4. Align the cabinet heights by adjusting the leveling feet.
5. Use the four screws from the joining kit (PN 70-40120-02) to join the
cabinets together. (graphic shows screw placement.)
6. Connect the ground wire to both cabinets. (graphic shows ground cable
placement.)
7. Set the cabinet ID number on the front door OCP push wheel according to
the rules for setting cabinet IDs.
8. If the cabinet has I/O drawers, set the push wheel ID number on the
drawer OCP according to the rules for setting drawer IDs.
9. Cabling depends upon the contents of the expander cabinet and the
contents of the system cabinet. I/O drawers must be connected using an
IP cable to an I/O CPU connector. Storage shelves must be connected to
storage shelf controllers in I/O drawers.