EasyManua.ls Logo

HP Compaq ProLiant DL360 Generation 2 - Server Options: Power Cords and Service Plans; Power Cord Options; 4-Hour On-Site Hardware Services

HP Compaq ProLiant DL360 Generation 2
43 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Power Cords
NOTE:
The Compaq ProLiant DL360 G2 ships with an IEC-IEC power cord used
for rack mounting with Power Distribution Units (PDUs). For stand-alone
deployments or installation without a rack, country-specific power cord options
are available. U.S. & Japan models will ship with two power cords: IEC-IEC
(142257-002) and North American C13-Nema 5-15P (103541-001) cords.
Power Cord, Euro, 10A 250 V Straight (12 ft/3.7 m)
157215-021
Power Cord, UK, 10A 250 V Straight (12 ft/3.7 m)
157216-031
Power Cord, Danish, 10A 250 V Straight (12 ft/3.7 m)
157218-081
Power Cord, Swiss, 10A 250 V Straight (12 ft/3.7 m)
157219-111
Power Cord, Italian, 10A 250 V Straight (12 ft/3.7 m)
157217-061
Power Cord, South Africa, 10A 250 V Straight (12 ft/3.7 m)
157220-AR1
Service and Support
Offerings
(HP Care Pack
Services)
Hardware Services 4-Hour On-site Service
5 x 9 Coverage, 3 Years (6-3 Part Number for U.S.)
162676-002
5 x 9 Coverage, 3 Years (6-3 Part Number for Canada)
162676-122
5 x 9 Coverage, 3 Years (6-3 Part Number for EMEA)
324416-002
7 x 24 Coverage, 3 Years (6-3 Part Number for U.S.)
162675-002
7 x 24 Coverage, 3 Years (6-3 Part Number for Canada)
162675-122
7 x 24 Coverage, 3 Years (6-3 Part Number for EMEA)
376910-022
Installation & Start-up Services
Hardware Installation (6-3 Part Number for U.S.)
401791-002
Hardware Installation (6-3 Part Number for Canada)
401791-122
Hardware Installation (6-3 Part Number for EMEA)
Quote
Server Installation and Set-Up (Installation of the server, installation of the
appropriate service tools, check to ensure device SW and firmware is loaded
and installation of the operating system software (6-3 Part Number for EMEA)
204563-022
Pre-installation planning; unpack equipment, install most current Compaq HW
options internal to server at same time of server installation; assemble & test;
basic user information provided; Install & configure basic functionality of Win NT
Operating System plus up to 1 day start-up activity, configure print & network
access services, and orientation (6-3 Part Number for U.S.)
240013-002
Pre-installation planning; unpack equipment, install most current Compaq HW
options internal to server at same time of server installation; assemble & test;
basic user information provided; Install & configure basic functionality of Novell
NetWare Operating System plus up to 1 day start-up activity, configure print &
network access services, and orientation (6-3 Part Number for U.S.)
240008-002
HP Care Pack Priority Services for ProLiant Servers – Priority Level
9 x 5 HW, 4-hr response, Next Available HW engineer; 9 x 5 Bronze Software
Support 2-hr response for Windows NT, Windows 2000, Professional, Server or
Advanced Server Operating System, Next Available Specialist (6-3 Part Number
for U.S.)
239928-002
9 x 5 HW, 4-hr response, Next Available HW engineer; 9 x 5 Bronze Software
Support 2-hr response for Novell NetWare Operating System, Next Available
Specialist (6-3 Part Number for U.S.)
239968-002
5 x 9 4-hour H/W, 5 x 9 2-hour O/S (NT & NetWare), Three Years (2-5-2 Part
Number for Canada)
FP-CZ101-36
5 x 9 4-hour H/W, 5 x 9 2-hour O/S (NT & NetWare), Three Years (2-5-2 Part
Number for Canada)
FP-CZ101-36
5 x 9 4-hour H/W, 5 x 9 2-hour O/S (NT & NetWare), Three Years (6-3 Part
Number for Canada)
155323-122
QuickSpecs
Compaq ProLiant DL360 Generation 2
Options
DA - 11049 Worldwide QuickSpecs — Version 35 — 9.30.2003
Page 32

Related product manuals