EasyManua.ls Logo

HP mt40 - Page 24

HP mt40
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Standard Operation Procedure
Document No. : NAIROBI FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step
Loosen Screws
22(1/1)
0.1
2012/10/30
1. Disassemble the 4 cables from routing rib.
(Fig.1)
2. Loosen screw * 2. (Fig.2/Fig.3)
1
2
Fig.1
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator Issue department
Alicia Chien
NPSU-SE
Fig.2
Fig.3
Electric cross screwdriver (1#) 1

Related product manuals