Standard Operation Procedure
Document No. : NAIROBI FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
::
:
1. Have the hinge be vertical by wrench.
2. Disassemble the top case.
Disassemble Top Case
23(1/1)
0.1
2012/10/30
Fig.1
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator: Issue department:
Alicia Chien
NPSU-SE
Wrench 1
Fig.2
Fig.3