2-5
Installing the Switch
Installation Procedures
1. Prepare the Installation Site
Cabling Infrastructure - Ensure the cabling infrastructure meets the
necessary network specifications. See appendix A, “Cabling and
Technology Information Specifications” for more information:
Installation Location - Before installing the switch, plan its location and
orientation relative to other devices and equipment:
In the front or back of the switch, depending on where the ports are
located, leave at least 7.6 cm (3 inches) of space for the twisted-pair
and fiber-optic cabling.
In the back of the switch, leave at least 3.8 cm (1 1/2 inches) of space
for the power cord.
On the sides of the switch, leave at least 7.6 cm (3 inches) for cooling.