EasyManua.ls Logo

HP ProCurve 2610-48-PWR

HP ProCurve 2610-48-PWR
168 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Power over Ethernet
HP ProCurve Power over Ethernet (PoE/PoE+)
Planning and Implementation Guide

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the HP ProCurve 2610-48-PWR and is the answer not in the manual?

HP ProCurve 2610-48-PWR Specifications

General IconGeneral
Power over Ethernet (PoE)Yes
PoE Power Budget370W
Jumbo Frame SupportYes
ManagementWeb-based GUI, CLI, SNMP
Rack MountableYes
FeaturesVLAN, QoS
Operating Temperature0 to 50 °C
Operating Humidity10% to 90% (non-condensing)
Power Supply100-240 VAC, 50/60 Hz

Summary

1 Introduction

Overview

Provides an overview of Power over Ethernet (PoE/PoE+).

PoE Capabilities of the Products

Details the capabilities of HP ProCurve PoE switch devices and their support for PoE/PoE+.

2 Operating Rules

Overview of Switch PoE Operation

Discusses the operating rules and characteristics of HP ProCurve switches and power supplies.

Configuring PoEPoE+ Power Using the CLI

Details how to configure PoE/PoE+ power allocation via the command line interface.

Provisioning Power for PoE

Explains how to use external power supplies for redundant or extra PoE power.

3 Planning and Implementation for the 2520 and 2520 G Switches

Planning the PoE Configuration

Guides the planning process for building a PoE configuration for 2520/2520G switches.

HP ProCurve 2520-8-PoE and 2520 G-8-PoE Configurations

Shows example configurations and power availability for 8-port 2520/2520G PoE switches.

10 Planning and Implementation for the 5400 zl8200 zl Switches

Planning Your PoE Configuration

Guides the planning process for building PoE configurations for 5400zl/8200zl switches.

Power Configuration for HP ProCurve 5406 zl8206 zl PoEPoE+ Switches

Details PoE/PoE+ power configurations and redundancy for 5406zl/8206zl switches.

Standard J8712 A Configurations

Example configurations using standard J8712A power supplies in 5412zl/8212zl chassis.

11 Infrastructure Requirements

Air conditioning

Discusses cooling requirements for switches and PoE devices due to heat generation.

Power requirements

Ensures sufficient power supply to the area where switches are mounted, considering dual power supplies.

A Planning Considerations

General Considerations

Example list of planning considerations for any switch series, including device needs and port counts.

Specific Considerations for the 5400 zl8200 zl Switches

Planning phase considerations specific to the 5400zl/8200zl Switches.

Related product manuals