EasyManua.ls Logo

HP ProCurve zl Series

HP ProCurve zl Series
58 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
A-3
Planning Considerations
Specific Considerations for the 5400zl Switches
Planning Considerations
Specific Considerations for the 5400zl
Switches
The following is an example list of considerations during the planning phase
specific to the Series 5400zl Switches:
What if power is lost to the switch?
Power for the switch to operate (system power)
Power for PoE devices
Which devices to plug into which ports, modules, and with what priorities?
Slot prioritization
Port prioritization
Port priority class
Reserve watts
Total watts available
Which modules will be used for PoE and which will not?
Will load balancing be used?

Related product manuals