EasyManua.ls Logo

HP ProOne 600 G3

HP ProOne 600 G3
33 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Standard Operation Procedure
Tabulator Issue Department
Xin-Xin Chen NPSU-PPE
Auditor
Ethan Lai
Steps
Document No. : Pegasus600 DISASS’Y SOP Station :
Operation Name : Ver. : Date :
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification)
Qty.
Fixture list (Specification)
Qty.
Remove Stand
1. Take out Stand and put into the material box
(Fig. 1, 2).
Follow the steps as Fig. 1 & 2, push the
black button, then pull up Stand.
Glove Requirements: Half-fingered gloves
Fig. 1
Fig. 2
1(1/1)
2017/5/23
1.00
Push the black button
Pull up Stand

Other manuals for HP ProOne 600 G3

Related product manuals