Standard Operation Procedure
Tabulator: Issue Department:
Xin-Xin Chen NPSU-PPE
Auditor :
Ethan Lai
Steps:
Document No. : Pegasus600 DISASS’Y SOP Station :
Operation Name : Ver. : Date :
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification)
Qty.
Fixture list (Specification)
Qty.
Remove Stand
1. Take out Stand and put into the material box
(Fig. 1, 2).
Follow the steps as Fig. 1 & 2, push the
black button, then pull up Stand.
Glove Requirements: Half-fingered gloves
Fig. 1
Fig. 2
1(1/1)
2017/5/23
1.00
Push the black button
Pull up Stand