Standard Operation Procedure
Tabulator: Issue Department:
Xin-Xin Chen NPSU-PPE
Auditor :
Ethan Lai
Steps:
Document No. : Pegasus600 DISASS’Y SOP Station :
Operation Name : Ver. : Date :
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification)
Qty.
Fixture list (Specification)
Qty.
3(1/1)
2017/5/23
1.00
Glove Requirements: Half-fingered gloves
Take out M/B shielding
Fig. 1
1. Take out M/B shielding (Fig. 1).
Follow the direction of red arrow to pull open
the spring, then pull up obliquely to take out
the shielding along the direction of upper left
corner.
Notice the hooks in red box in Fig. 1.
Obliquely take
out the shielding
along the
direction of
upper left corner
Pull open
the spring