EasyManua.ls Logo

HPC EI Series - Villa Series Installation; Villa Series Installation Requirements; Countertop Cut-out Diagram

HPC EI Series
45 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
23
Villa Series Installation
Install The Villa Series only in a solid surface counter that is able to withstand high temperatures,
like: granite, concrete, or ceramic tile.
Keep combustible materials 12 inches from side of oven’s hearth
Two people or more are necessary for installation of the oven.
oven cannot be set on top of counter( its design needs to have air flow throughout the entire
bottom)
*Minimum opening width has to be 33 1/2 inches
*Maximum opening width has to be 33 3/4 inches
*Support is needed on each side of the counter 1 ½ inches from rough opening (locking tabs from
phalange need to go underneath the counter)
* Oven cannot be set on top of counter (its design needs to have air flow throughout the entire bottom)
Cut-out Diagram for Countertop
For flange rough opening cutout
Rough opening 33 1/2”– 33 3/4”
wide
Rough opening 32”deep
Front of counter
Back of counter
This yellow area must stay
open underneath. Do not install
oven on top of counter
Min. countertop depth
34”

Related product manuals