5. Allow appliance to operate normally. Ensure it is operating properly.
6. Reinstall the appliance front cover.
7. Use a Phillips Head screwdriver to reinstall the appliance top cover.
*In order to increase CO
2
values on high fire, the gas orifice size can be increased to achieve the maximum CO
2
value listed in Table
27. Contact the factory for recommended orifice sizes to achieve the desired setting.

Table of Contents

Other manuals for HTP EFTC-199W

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the HTP EFTC-199W and is the answer not in the manual?

HTP EFTC-199W Specifications

General IconGeneral
BrandHTP
ModelEFTC-199W
CategoryBoiler
LanguageEnglish

Related product manuals