EasyManua.ls Logo

HTP UFT-100W User Manual

HTP UFT-100W
90 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
272 Duchaine Blvd. New Bedford, MA 02745 www.htproducts.com
LP-542 REV. 6.2.16
Universal Fire Tube Boiler
Wall Mount
INSTALLATION
START-UP
MAINTENANCE
PARTS
WARRANTY
Models
UFT-80W / 100W / 120W / 140W / 175W / 199W
Heat Exchanger Bears the ASME “H” Stamp
NOTICE: HTP reserves the right to make product changes or updates without notice and will not be held liable for typographical errors
in literature.
NOTE TO CONSUMER: PLEASE KEEP ALL INSTRUCTIONS FOR FUTURE REFERENCE.
IF THE INFORMATION IN THIS MANUAL IS NOT FOLLOWED EXACTLY, A FIRE OR EXPLOSION MAY RESULT, CAUSING
PROPERTY DAMAGE, PERSONAL INJURY, OR LOSS OF LIFE. DO NOT STORE GASOLINE OR OTHER FLAMMABLE VAPORS
AND LIQUIDS IN THE VICINITY OF THIS OR ANY OTHER BOILER.
WHAT TO DO IF YOU SMELL GAS
Do not try to light any appliance.
Do not touch any electrical switch.
Do not use any phone in your building.
Immediately call your gas supplier from a neighbor’s phone. Follow the gas supplier’s instructions.
If you cannot reach your gas supplier, call the fire department. Installation and service must be provided by a qualified installer,
service agency, or the gas supplier.

Table of Contents

Other manuals for HTP UFT-100W

Questions and Answers:

HTP UFT-100W Specifications

General IconGeneral
Fuel TypeNatural Gas or Propane
Heat Exchanger MaterialStainless Steel
Input BTU100, 000 BTU/h
Efficiency95%
Boiler TypeCondensing

Summary

Safety Regulations

Operation and Installation Warnings

Critical warnings for safe boiler operation and installation, covering gas and combustion hazards.

Improper Combustion Hazards

Discusses risks of improper combustion, carbon monoxide, and venting safety.

Boiler Location Preparation

Pre-Installation Location Checks

Critical factors to consider before selecting the boiler's installation site.

Service and Operation Clearances

Minimum clearances required around the boiler for service and operation.

Exhaust Vent and Intake Pipe Installation

Guidelines and requirements for installing vent and intake piping.

Preventing Combustion Air Contamination

Methods to avoid contaminants entering the combustion air supply.

Wall-Mounting the Boiler

Instructions and safety precautions for mounting the boiler on a wall.

Venting System Installation

Intake Pipe and Exhaust Vent Guidelines

General rules for installing vent and intake pipes according to codes.

Approved Vent Materials

List of materials permitted for use in venting systems.

Vent Termination Methods

Various methods and requirements for terminating vent systems.

Install the Condensate Drain

Gas Piping Installation

Gas Connection Requirements

Specifications and requirements for making gas connections.

Water Piping Installation

Central Heating Piping Methods

Methods for connecting central heating system water piping.

CH Pressure Relief Valve Installation

Proper installation and function of the central heating pressure relief valve.

How the Boiler Operates

Heat Exchanger and Combustion System

Details on the stainless steel heat exchanger and modulating combustion system.

Control System Features

Overview of the control system, sensors, safeties, and modes.

Connect Electrical Power and Initial Startup

Wiring Information and Grounding

Essential procedures for proper electrical wiring and grounding.

Wiring a Cascade System

Instructions for connecting multiple boilers in a cascade setup.

Operating System Instructions

Control Panel Overview

Description of buttons and functions on the boiler's control panel.

LCD Display and Icon Descriptions

Explanation of the LCD display elements, icons, and status indicators.

Installer Mode Configuration

Accessing and utilizing the installer mode for advanced settings.

Error Mode and Error Codes

Understanding boiler error codes and their corresponding remedies.

Start-Up Preparation

Filling and Testing the Water System

Steps for filling the system with water and conducting leak tests.

Adjusting Gas Pressure at the Boiler

Procedure for setting and verifying the correct gas pressure.

Setting and Verifying Combustion

Adjusting and verifying combustion settings using a analyzer.

Installation and Start-Up Checklist

Troubleshooting Guide

Annual Maintenance Procedures

Limited Warranty Information

Start-Up Report

Related product manuals