EasyManua.ls Logo

HTP UFT-140W - APS;BURNER OVERHEAT LIMIT; CONDENSATE BLOCK SWITCH; PART 11 - START-UP PREPARATION

Default Icon
90 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
64
LP-542 REV. 6.2.16
3. APS / BURNER OVERHEAT LIMIT / CONDENSATE BLOCK SWITCH
Figure 54 APS / Burner Overheat Limit / Condensate Block Switch Error Analysis Tree
4. STORAGE / OP / CH OVERHEAT / EXHAUST OVERHEAT SENSORS
Figure 55 DHW / OP / CH Overheat / Exhaust Overheat Sensors Error Analysis Tree
PART 11 START-UP PREPARATION
Thoroughly clean and flush any system that has used glycol before installing the boiler.
Do not use petroleum-based cleaning or sealing compounds in the boiler system. Damage to elastomer seals and gaskets in the
system could occur, resulting in substantial property damage.
Clean system to remove sediment*
1. You must thoroughly flush the system (without the boiler connected) to remove sediment. The high-efficiency heat exchanger can be
damaged by buildup or corrosion due to sediment.
2. For zoned systems, flush each zone separately through a purge valve. (If purge valves and isolation valves are not already installed,
install them to properly clean the system.)
3. Check return Y strainer. Remove and clean sediment and debris if necessary.
4. Flush system until water runs clean and you are sure piping is free of sediment.
*NOTE: It is recommended you clean heat exchanger at least once a year to prevent lime scale buildup. Follow the maintenance
procedure to clean the heat exchanger in this manual.
NOTE: BOILER FAILURE DUE TO IMPROPER WATER CHEMISTRY IS NOT COVERED BY WARRANTY.

Table of Contents

Other manuals for HTP UFT-140W

Related product manuals