AP4050DN-HD
Hardware Installation and Maintenance Guide 5 Appendix
Issue 01 (2016-04-15) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
57
Figure 5-47 Crossing two terminals
If the two terminals are different sizes, place the smaller one above the bigger one. A
maximum of two terminals can be installed on a post.
To remove an OT terminal, loosen the screw counterclockwise.
----End
Installing the Cord End Terminal
Procedure
Step 1 Hold a cord end terminal upright and place it on a terminal jack, as shown in Figure 5-48. To
ensure bump contact and dense connection, place the plain side of the terminal outwards.
Figure 5-48 Placing a terminal on a terminal jack vertically
Step 2 Insert the terminal into the jack vertically, and turn the screw clockwise to fasten the terminal,
as shown in Figure 5-49.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Huawei AP4050DN and is the answer not in the manual?

Huawei AP4050DN Specifications

General IconGeneral
BrandHuawei
ModelAP4050DN
CategoryWireless Access Point
LanguageEnglish

Related product manuals