Huawei BTS3900A User Manual

Huawei BTS3900A
29 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
mm
m
Y
!
)!
1
8
CD1
C
EF8
GHI)J)
YY
 !"#
K))LM

Other manuals for Huawei BTS3900A

Question and Answer IconNeed help?

Do you have a question about the Huawei BTS3900A and is the answer not in the manual?

Huawei BTS3900A Specifications

General IconGeneral
BrandHuawei
ModelBTS3900A
CategoryAccessories
LanguageEnglish

Summary

2G BTS3900A Configuration

Plinth Installation Requirements

Base Installation Procedure

Cabinet Installation Steps

Component Installation in Cabinet

Installing BBU, DRFU, PMU, and PSU

Procedure for installing key components like BBU, DRFU, PMU, and PSU into the cabinet.

DC Cable Connections for BBU and DRFU

Connecting DC Power to BBU and DRFU Units

Instructions for connecting DC cables to the 'Load5' terminal and DRFU units.

CPRI Cable Installation for DRFU

Linking GTMU and DRFU with CPRI Cables

Guide for connecting CPRI cables between GTMU and DRFU, specifying port usage and routing.

E1 Cable Connectivity

RF Cable Installation

Stacking Battery Cabinets

Procedure for Stacking Two Battery Cabinets

Step-by-step instructions for installing and securing the upper battery cabinet onto the lower one.

Battery Installation and Safety

Connecting DC Cables to Batteries

Instructions for connecting DC cables to battery banks and safety precautions.

Grounding Cable Installation

Connecting Grounding Cables (PGND and Equipotential)

Procedure for installing PGND and equipotential grounding cables from APM30 to cabinets.

AC Input Cable Connection

AC Power Cable Routing

SPD Installation for BTS

Antenna System Grounding

Antenna System Installation Details

Final Installation Checks

Grounding and Cable Management Verification

Checking grounding, SPD, pipe, power cables, and ensuring neat cable ties.

Cabinet Power-On Procedure

AC and DC Breaker Operations

Steps for switching AC/DC breakers and verifying PMU/PSU indicators.

BTS Commissioning and Testing

E1 Connectivity Check and Service Testing

Verifying E1 cable status and performing test calls for cell broadcast and GPRS services.