BTS3900L (Ver.C)
Installation Guide
Issue 07
Date 2013-11-08
HUAWEI TECHNOLOGIES CO., LTD.

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Huawei BTS3900L and is the answer not in the manual?

Huawei BTS3900L Specifications

General IconGeneral
Weight≤ 45 kg (full configuration)
Power Supply-48 V DC
Operating Temperature-40°C to +50°C
UMTS Carriers per CabinetUp to 6
CategoryBase Station

Summary

Preparing for Installation

2.1 Document Preparations

This section describes the reference documents required before starting the installation process.

2.2 Preparing Tools and Meters

Lists the necessary tools and meters for performing the installation.

2.3 Skills and Requirements for Onsite Personnel

Details the qualifications and training required for installation engineers.

Information About the Installation

3.1 Configurations of the BTS3900L Cabinet

Describes the interior layout and components of the BTS3900L cabinet.

3.2 Application Scenario of the BTS3900L Cabinet (Only RFUs Configured)

Explains configurations for single, dual, and triple-mode base stations with only RFUs.

3.3 Application Scenario of the BTS3900 Cabinet (RRUs and RFUs Configured)

Details configurations for base stations with both RRUs and RFUs.

3.4 Installation Clearance and Position Requirements

Specifies the necessary space and positioning requirements for cabinet installation.

Unpacking the Equipment

Context

Provides context and notes on handling and unpacking equipment, including time limits for powering on.

Procedure

Outlines the step-by-step process for unpacking and checking delivered equipment.

Obtaining the ESN

Procedure

Details the method for obtaining the Electronic Serial Number (ESN) for network elements.

Checking Installed Modules and Cables

Checklist for the Modules

Ensures that all modules are securely installed and tightened in the cabinet.

Checklist for the Cables

Verifies that power and other cables are securely connected and tightened.

Installing the Cabinet

8.1 Installing the Cabinet Without a Base

Describes how to install the BTS3900L cabinet directly onto the floor without a base.

8.2 Installing the Cabinet with Base on the Concrete Floor

Details the procedure for installing the cabinet base and the cabinet on a concrete floor.

8.3 Installing a Cabinet with Base on an ESD Floor

Explains how to install the cabinet base and the cabinet on an ESD-resistant floor.

Installing a PGND Cable

Prerequisites

Lists the tools required for installing the PGND cable.

Context

Provides specifications for the PGND cable.

Procedure

Details the steps for preparing and connecting the PGND cable for proper grounding.

(Optional) Installing the Modules

10.1 Installing the GPS surge protector

Procedure for installing a GPS surge protector on the USCU.

10.2 Installing the GATM and Bias-Tee

Describes installation of GATM and Bias-Tee when used with DRFU.

10.3 Installing the DCDU-11B

Instructions for wall-mounting DCDU-11B to supply power to RRUs.

10.4 Installing the BBU Case

Procedure for installing the Baseband Unit (BBU) case.

10.5 Installing the BBU Components

How to install boards into the BBU and SLPU.

Installing the Cables

11.1 Cabling Requirements

Specifies rules for routing cables to prevent signal interference and ensure neatness.

11.2 Cable Routes

Details how cables should be routed within the cabinet and secured with ties.

11.3 Installing the Power Cables

Procedures and precautions for installing power cables in different scenarios.

11.4 Installing a BBU Power Cable

Step-by-step guide for connecting power cables to the BBU.

11.5 (Optional) Installing RRU Power Cables

Instructions for installing power cables for Remote Radio Units (RRUs).

11.6 Installing the Transmission Cables

Procedures for installing E1/T1 or FE/GE cables for data transmission.

11.7 Installing the Monitoring Signal Cables

Describes installing monitoring signal cables and important notes.

11.8 Installing an RF Jumper

How to connect RF jumpers between RFUs and the antenna system.

11.9 Installing the CPRI Cable

Procedure for installing CPRI electrical cables between RF modules and BBUs.

11.10 (Optional)Installing a CPRI Optical Fiber

Details routing CPRI fiber optic cables between BBUs and RRUs.

Installation Checklist

Cabinet Installation Checklist

Checklist items for ensuring the cabinet is installed correctly and securely.

Installation Environment Checklist

Verifies the installation site is clean and free of unnecessary materials.

Electric Connection Checklist

Ensures all electrical connections, including PGND cables, are made correctly.

Cable Installation Checklist

Confirms cables are connected accurately, securely, and neatly bound.

Powering On the BTS3900L

Prerequisites

Confirms power cables are connected, switches are OFF, and external power is shut off.

Context

Explains powering on and handling power supply failures for the BTS3900L cabinet.

Procedure

Step-by-step guide to powering on the BTS3900L, checking voltages, and verifying component status.