7 Checking Installed Modules and Cables
This section describes how to check the internal modules and cables that are installed before
delivery.
Checklist for the Modules
Ensure that the modules are securely installed in the cabinet. Tighten the screws if necessary.
Checklist for the Cables
Check whether the power cables are securely connected, and the screws are tightened on the
cables in the cabinet by referring to Figure 7-1 and Table 7-1.
Figure 7-1 Power cables in the cabinet
BTS3900L (Ver.C)
Installation Guide 7 Checking Installed Modules and Cables
Issue 07 (2013-11-08) Huawei Proprietary and Confidential