2 Preparing for Installation
About This Chapter
This section describes the tools and meters that need to be available before the installation. It
also describes the skills and qualifications that the installation engineers must possess.
2.1 Document Preparations
This section describes the reference documents that must be ready before the installation.
2.2 Preparing Tools and Meters
This section describes the tools and meters that are required before installation.
2.3 Skills and Requirements for Onsite Personnel
Onsite personnel must be qualified and trained. Before performing any operation, onsite
personnel must be familiar with correct operation methods and safety precautions.
BTS3900L (Ver.C)
Installation Guide 2 Preparing for Installation
Issue 07 (2013-11-08) Huawei Proprietary and Confidential