6 Installation Process
The installation procedure mainly involves installing the cabinet and installing cables. In
addition, installing optional modules according to the requirements onsite may also be included
in the installation procedure.
NOTE
In a triple-mode scenario, if a cabinet is configured with two BBU, the BBU case, power cable, and CPRI
cable must be installed on site.
Figure 6-1 shows the installation procedure.
BTS3900L (Ver.C)
Installation Guide 6 Installation Process
Issue 07 (2013-11-08) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
21