1 Changes in BTS3900L (Ver.C) Installation
Guide
This chapter describes the changes in BTS3900L (Ver.C) Installation Guide.
07 (2013-11-08)
This is the seventh official release.
Compared with issue 06 (2013-08-23), no topic is added.
Compared with issue 06 (2013-08-23), this issue incorporates the following changes:
Topic Change Description
l 3.1 Configurations of the BTS3900L
Cabinet
l 3.3 Application Scenario of the
BTS3900 Cabinet (RRUs and RFUs
Configured)
Deleted the description of that a DCDU-11B or
DCDU-12B can be configured in the
BTS3900L (Ver.C) cabinet.
Installing a DCDU-11B Deleted the steps of installing a DCDU-12B on
the wall.
11.5 (Optional) Installing RRU Power
Cables
l Deleted the description of installing RRU
power cables when a DCDU-12B is
installed to supply power.
l Added the steps of installing a ground clip
to ground RRU power cables near the
feeder window when the RRUs are installed
outdoors.
Compared with issue 06 (2013-08-23), the following topic is deleted:
l Installing a DCDU-11B or DCDU-12B in a Cabinet
BTS3900L (Ver.C)
Installation Guide
1 Changes in BTS3900L (Ver.C) Installation Guide
Issue 07 (2013-11-08) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
1