UPS 1
BATT.±240 V DC port
UPS 2
BATT.±240 V DC port
14
Connecting Cables to Battery Packs for a UPS2000-G-15 kVA or
UPS2000-G-20 kVA Parallel System
If the UPS2000-G-15 kVA/20 kVA 1+1 parallel system does not share battery packs, the cable
connection methods for each UPS and battery pack in the parallel system are the same as those in a
single UPS system.
NOTE
NOTE
Install the battery pack front panel after cables are properly connected.