EasyManua.ls Logo

Huawei LUNA2000 Series User Manual

Huawei LUNA2000 Series
85 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
LUNA2000-(5-30)-S0
User Manual
Issue
01
Date
2020-09-18
HUAWEI TECHNOLOGIES CO., LTD.

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Huawei LUNA2000 Series and is the answer not in the manual?

Huawei LUNA2000 Series Specifications

General IconGeneral
Battery TypeLithium Iron Phosphate (LFP)
Usable Energy per Module5 kWh
Nominal Voltage360 V
Maximum Output Power (Single Battery Module)2.5 kW
Operating Temperature Range-10°C to +55°C
CoolingNatural Convection
CommunicationCAN, RS485
Weight per Module50 kg
Peak Output Power (Single Battery Module)3.5 kW for 10 seconds
Nominal Capacity Options5 kWh
Cycle Life6000 cycles at 80% DoD
Energy Efficiency≥96%

Summary

Safety Precautions

General Safety

Provides fundamental safety rules to prevent injuries and property damage.

Personnel Requirements

Specifies the necessary qualifications and training for personnel.

Electrical Safety

Details electrical safety measures, including grounding and high-voltage precautions.

Maintenance and Replacement

Details procedures for system upkeep, component replacement, and troubleshooting.

Application Scenarios and Settings

Grid-tied ESS

Covers configurations and settings for grid-tied energy storage systems.

Setting the Grid-tied ESS Mode

Explains how to configure the working modes for grid-tied ESS.

Grid-tied and Off-grid ESS

Details scenarios and configurations for hybrid grid-tied and off-grid systems.

Setting the Grid-tied and Off-grid ESS Mode

Explains how to configure modes for hybrid grid-tied/off-grid operation.

System Installation

Equipment Installation

Details the procedures for physically installing the battery system.

Electrical Connection

Internal Electrical Connections of the Battery

Instructions for making electrical connections within the battery unit.

External Electrical Connections of the Battery

Instructions for making external electrical connections to the battery.

Installing DC Input Power Cables

Steps for connecting external DC input power cables to the inverter.

System Commissioning

Verification Before Power-On

Lists essential checks to perform before initial system power-up.

Battery Commissioning

Covers the final setup and configuration steps for the battery.

Battery Deployment

Steps to add the battery and configure its working mode via the app.

Battery Control

Instructions for setting battery parameters and operational modes through the app.

System Maintenance

Troubleshooting

Helps identify and resolve common issues and faults with the system.

Technical Specifications

Related product manuals