EasyManua.ls Logo

Huawei LUNA2000 User Manual

Huawei LUNA2000
96 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
LUNA2000-(5-30)-S0
User Manual
Issue 01
Date 2020-10-20
HUAWEI TECHNOLOGIES CO., LTD.

Table of Contents

Other manuals for Huawei LUNA2000

Question and Answer IconNeed help?

Do you have a question about the Huawei LUNA2000 and is the answer not in the manual?

Huawei LUNA2000 Specifications

General IconGeneral
BrandHuawei
ModelLUNA2000
CategoryCamera Accessories
LanguageEnglish

Summary

About This Document

Purpose

Describes the LUNA2000 battery's overview, scenarios, installation, maintenance, and specs.

Intended Audience

Lists sales engineers, system engineers, and technical support engineers as target readers.

Symbol Conventions

Defines the meaning of symbols like DANGER, WARNING, CAUTION, and NOTICE used in the document.

Safety Precautions

General Safety

Covers general safety instructions, requirements, and warnings for operating the equipment.

Personnel Requirements

Outlines necessary training, qualifications, and responsibilities for personnel handling the equipment.

Electrical Safety

Details grounding requirements, general electrical safety, and DC operation precautions to prevent shocks.

Installation Environment Requirements

Specifies suitable conditions and restrictions for installing the battery to ensure safety and performance.

Transportation Requirements

Covers UN38.3 and SN/T 0370.2-2009 certifications for dangerous goods transport.

Mechanical Safety

Provides safety guidelines for using ladders and drilling holes during installation.

Commissioning

Emphasizes correct parameter settings by professionals for proper operation and compliance.

Maintenance and Replacement

Details safety procedures for powering off, maintenance, and replacing components, including high voltage warnings.

Product Introduction

Overview

Introduces the LUNA2000 battery system, its function, and models.

Appearance

Describes the physical appearance of the battery and power control module with labeled components.

Label Description

Explains the meaning and purpose of various enclosure labels and nameplates on the equipment.

Features

Highlights key features like multi-scenario operation, intelligent control, scalability, and easy O&M.

Working Mode

Explains the different working modes (hibernation, standby, operating) of the battery system.

Application Scenarios and Settings

Grid-tied ESS

Details networking and settings for grid-tied energy storage systems.

Grid-tied and Off-grid ESS

Covers networking and settings for systems that operate both grid-tied and off-grid.

Pure Off-grid ESS

Describes networking and settings for systems operating exclusively in an off-grid environment.

System Installation

Checking Before the Installation

Guides on inspecting outer packing and deliverables for damage or missing items before installation.

Preparing Tools and Instruments

Lists the necessary tools and instruments required for system installation.

Determining the Installation Position

Provides basic requirements and angle considerations for selecting a safe and suitable installation location.

Equipment Installation

Details the procedures for floor-mounted and wall-mounted installation of the battery system.

Electrical Connection

Precautions

Emphasizes critical safety measures and warnings before performing any electrical connections.

Preparing Cables

Specifies the types of cables required and their recommended specifications for connecting the battery system.

Internal Electrical Connections of the Battery

Guides on connecting internal ground cables, DC terminals, and signal cables within the battery.

External Electrical Connections of the Battery

Details how to route external cables and connect PE, DC input power, and signal cables.

Cascading Batteries

Explains the process of connecting multiple batteries in series for increased capacity or power.

Installing the Cover

Describes the steps for securely installing the external protective cover after electrical connections are made.

System Commissioning

Verification Before Power-On

Lists essential checks and acceptance criteria to ensure correct installation before powering on the system.

System Power-On

Provides instructions on powering on the battery and inverter, including LED indicator descriptions for status.

Battery Commissioning

Guides on downloading the app, deploying the battery, controlling parameters, and querying status.

Forced Charge and Discharge

Explains how to manually initiate charging or discharging of the battery and set parameters.

Downloading an Upgrade Package

Details the process of downloading firmware and grid code updates for the system.

System Maintenance

System Power-Off

Outlines safety precautions and steps for safely powering off the system before maintenance.

Routine Maintenance

Provides a checklist and schedule for performing regular maintenance tasks to ensure long-term operation.

Troubleshooting

Lists common alarms, their possible causes, and step-by-step troubleshooting measures for resolving issues.

Battery Storage and Recharge

Covers requirements for storing batteries, judging overdue storage, and the process of recharging.

Technical Specifications

LUNA2000-5KW-C0

Lists the technical specifications for the LUNA2000-5KW-C0 power control module.

LUNA2000-5-E0

Lists the technical specifications for the LUNA2000-5-E0 battery expansion module.

FAQ

How Do I Replace a Fuse?

Provides a step-by-step guide on how to safely replace a blown fuse in the equipment.

Acronyms and Abbreviations

Related product manuals