Installation Space Requirements
● Reserve sucient clearance around the battery to ensure sucient space for
installation and heat dissipation.
Figure 4-1 Installation space
4.4 Equipment Installation
4.4.1 Floor-Mounted Installation
Installation Precautions
Figure 4-2 shows the dimensions of mounting holes for a battery.
LUNA2000-(5-30)-S0
User Manual 4 System Installation
Issue 01 (2020-10-20) Copyright © Huawei Technologies Co., Ltd. 39