Do you have a question about the Huawei LUNA2000-2.0MWH-2H0 and is the answer not in the manual?
Brand | Huawei |
---|---|
Model | LUNA2000-2.0MWH-2H0 |
Category | Battery Pack |
Language | English |
General safety instructions, company liability, and precautions for equipment operation and environment.
Qualifications, training, and PPE requirements for personnel operating and maintaining the equipment.
Safety precautions for cabling, grounding, AC/DC power, maintenance, and handling electrical components.
Guidelines for ESS storage, installation environment, and specific requirements for battery storage.
Safety regulations for loading, unloading, and transporting the ESS, including compliance with dangerous goods standards.
Safety guidelines for hoisting, using jacks, and using ladders during installation and maintenance operations.
Precautions and requirements for safe handling of battery packs to prevent damage, leakage, and hazards.
Overview of the Smart String ESS capabilities, functions for power grid applications, and key system features.
Detailed breakdown of ESS components including battery cabins, control unit cabins, and smart rack controller cabins.
Configurations and components of the battery cabin, including door status sensors and air conditioners.
Components within the control unit cabin, such as fire alarm components, emergency stop, and door status sensors.
Detailed description of the ESS components, including power supply, monitoring, environmental control, and fire suppression systems.
Guidelines and restrictions for selecting installation sites, including environmental, safety, and distance considerations.
Requirements for concrete platform, trenches, ground resistance, and cabling space for ESS foundation construction.
Steps to prepare for installation, including gathering necessary tools and checking the environment.
Steps for installing the ESS, including determining position, hoisting, opening doors, grounding, and securing.
Prerequisites and precautions for safely hoisting the ESS using cranes and hoisting ropes.
Requirements and procedure for grounding the ESS, including ground cable specifications and connection steps.
Procedure for installing copper bars between battery packs, including safety precautions and torque specifications.
Procedure for installing DC power cables, including removing protective covers and connecting cables to the power module.
Procedure for installing AC input power cables, including removing covers, baffle plates, and connecting cables.
Overview of the system power-on sequence, guiding the user through the steps.
Steps and precautions for powering on the Energy Storage System (ESS).
Procedure and precautions for powering on the Smart PCS, including checking AC voltage and LED indicators.
Steps for preparing the PC, setting IP addresses, and logging into the SmartLogger WebUI.
Procedure for commissioning using the Deployment Wizard, including parameter setup, device search, and configuration.
Procedure for checking and clearing alarms in the SmartLogger WebUI, including verifying sensor connections.
Procedure for issuing a shutdown command to the Smart PCS and Smart Rack Controller via the SmartLogger WebUI.
Flowcharts illustrating the power-off process for LUNA2000-2.0MWH models.
Step-by-step procedure for safely powering off the Smart PCS, including PPE and voltage checks.
Procedure for powering off the Energy Storage System (ESS), including switching off various circuit breakers.
Procedure for performing a dielectric voltage withstand test on the AC side of the ESS.
Procedures for maintaining the CMU, including software upgrades, log export, and alarm clearing.
Prerequisites and procedure for logging into the SUN2000 app, including connection modes and initial login.
Notice and procedure for crimping OT and DT terminals, including stripping cables and using heat-shrink tubing.