EasyManua.ls Logo

Huawei LUNA2000-2.0MWH-1H1 User Manual

Huawei LUNA2000-2.0MWH-1H1
264 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
LUNA2000-2.0MWH Series Smart String ESS
User Manual
Issue 08
Date 2022-11-15
HUAWEI TECHNOLOGIES CO., LTD.

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Huawei LUNA2000-2.0MWH-1H1 and is the answer not in the manual?

Huawei LUNA2000-2.0MWH-1H1 Specifications

General IconGeneral
ModelLUNA2000-2.0MWH-1H1
Capacity2.0 MWh
Battery TypeLithium Iron Phosphate (LiFePO4)
Nominal Voltage (Single Battery Module)51.2 V
Cooling MethodAir Cooling
Operating Temperature Range-10°C to 50°C
Communication InterfaceEthernet, CAN, RS485
Cycle Life6000 cycles at 80% DoD

Summary

Safety Information

General Safety

General safety precautions and warnings for installation, operation, and maintenance.

Personnel Requirements

Specifies requirements for personnel operating the equipment, including training.

Electrical Safety

Guidelines for safe cabling, grounding, AC/DC power handling, and maintenance.

Battery Safety

Critical safety information and requirements for handling battery packs.

Overview

ESS Composition

Details on the main components and their configurations within the ESS.

Components

Detailed descriptions of individual system components and their functions.

Site Requirements

Site Selection Requirements

Criteria for selecting a safe and suitable site for ESS installation.

Installation

Installing the ESS

Procedures for positioning, hoisting, opening doors, grounding, and securing the ESS.

Installing Cables

Installing DC Power Cables

Steps for installing DC power cables, including connections and routing.

Installing AC Input Power Cables (With External Grid Power Supply)

Procedure for connecting AC input power cables from the grid supply.

Checking Before Power-On

General inspection

Checklists for equipment appearance, cable connections, and cleanliness.

ESS

Verification of ESS installation, grounding, and door functionality.

Powering On the System

Power-on Process

Overall sequence and steps for powering on the system components.

Powering On the ESS

Final steps and checks before powering on the entire Energy Storage System.

SmartLogger Web-based Deployment

Preparations and WebUI Login

Steps for preparing the PC and logging into the SmartLogger WebUI.

Powering Off the System

Delivering a Shutdown Command on the SmartLogger

Steps to issue shutdown commands to system components via SmartLogger.

Alarm Reference

CMU common alarms and troubleshooting measures

List of common alarms for CMU, their severity, cause, and troubleshooting.

Air Conditioner alarms

Troubleshooting for alarms related to air conditioners.

Rectifier related alarms

Troubleshooting for alarms related to the rectifier module.

ESC/BCU common alarms

Common alarms for ESC/BCU, including possible causes and suggestions.

BMU common alarms

Troubleshooting for Battery Monitoring Unit (BMU) common alarms.

Technical Data

APP Commissioning

Crimping an OT or DT Terminal