Figure 5-3 Connecting live wires and neutral wires
(1) 110 V switch installing position
● Installing a 220 V socket
– Connect the live wires (corresponding to cables 1757) and neutral wires
(corresponding to cables 1760) from the lower end of the terminal block
to the socket.
Step 3 Connecting ground cables: Determine whether the socket ground cables are
routed in from the top or bottom.
Step 4 applies to the scenarios where a 220 V or 110 V socket is installed. The following
gure uses a 220 V socket as an example.
● If cables are routed in from the top of the socket, the cables (1761) are
connected to the ground points. Remove the other end of the cables from the
rear panel and connect them to the ground points of the socket.
LUNA2000-2.0MWH Series Smart String ESS
User Manual 5 Installing Cables
Issue 08 (2022-11-15) Copyright © Huawei Technologies Co., Ltd. 115