EasyManua.ls Logo

Huawei F01T500 - Page 80

Huawei F01T500
85 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11 Powering On the Device (RPS Power Supply)
75
The cabinet must be powered on within seven days after installation.
To ensure the safety, before powering on the device, check whether condensation exists in the cabinet. Power on the
device only after you ensure that no condensation exists. For the detailed method of removing condensation, see the
corresponding label on the cabinet front door.
Green: on for 1s and off for 1s repeatedly
LED for fan tray
Green on

Table of Contents