No.S004 Pre-fab. Module Pipe Installation Position Diagram
A part enlarged at 4:1
Note:
1. The air conditioner cable outlet assembly (PG connector) and other materials have been
installed by the assembly factory.
Cross-sectional view of air
conditioner outdoor pipes and
cables
Gas
pipe
Liquid
pipe
Power
cable
Winding tape
Thermal
insulation
foam
A/C drainpipe (PPR)
A/C water refill pipe (PPR)
A/Ccooling copper
pipe - liquid pipe
A/Ccooling copper pipe - gas pipe
Outdoor unit power cable
Outdoor unit signal cable
A
Signal cable for the electric heater controller
probe of water supply and drainage
Electric heating belt for water supply and drainage
Outdoor unit signal cable
A/Ccooling copper pipe - liquid pipe
A/Ccooling copper pipe - gas pipe
Outdoor unit power cable
Signal cable