Step 1 Determine the fire cylinder installation position based on the fire cylinder installation position
diagram.
Step 2 Move the fire cylinder using a pallet truck to a position near the pre-fab. module door closest
to the installation position.
Step 3 Untie the preconfigured straps at the installation position of the fire cylinder.
Step 4 Move the fire cylinder to the installation position and secure it.
Step 5 Install the threaded adapter and high-pressure hose.
NOTICE:
Install the threaded adapter and then the high-pressure
hose.
Wrap the threads with sealing tape to ensure air tightness.
(1) Threaded adapter (2) High-pressure hose
Installing Fire Cylinders
Installing Extinguishant Control Panel
Batteries
UPS5000E-A1
800K
Li Batt.-
A1
80AH
UPS5000E-B1
800K
Power
cabinet
Power
cabinet
Bypass
cabinet
Bypass
cabinet
CRAC-A1(indoor With
Electic Heating &
Humidifier 55KW)
CRAC-B1(indoor With
Electic Heating &
Humidifier 55KW)
SMDB-A1
1250A
SMDB-B1
1250A
Power
cabinet
Power
cabinet
Bypass
cabinet
Bypass
cabinet
Li Batt.-
-A2
80AH
Li Batt.-
-B1
80AH
Li Batt.-
-B2
80AH
Li Batt.-
-B3
80AH
Li Batt.-
-B4
80AH
Li Batt.-
-B5
80AH
Li Batt.-
-B6
80AH
Li Batt.-
-B7
80AH
Li Batt.-
-B8
40AH
BBB-1250A
-B1
BBB-1250A
-A2
Li Batt.-
-A3
80AH
Li Batt.-
-A4
80AH
Li Batt.-
-A5
80AH
Li Batt.-
-A6
80AH
Li Batt.-
-A7
80AH
Li Batt.-
-A8
80AH
POWER
DB-1
BBB-1250A
-A1
Dehumidifier-1
Bottom of
entry
Bottom of
entry
Bottom of
entry
Bottom of
entry
Bottom of
entry
Bottom of
entry
BBB-1250A
-B2
Install the gas cylinder
Install two 12 V/7.2Ah batteries for the ECP .
B
Extinguishant Control Panel-1
D
Electrical Actuator-1
P
Pneumatic Switch-1
Bind the solenoid valve to the
wall and install it on the cylinder
valve onsite.
The pneumatic switch is
preinstalled. Connect the flexible
hose on the pneumatic switch to the
cylinder valve onsite.
No.F004 Fire Extinguishing Device Installation Position Diagram