EasyManua.ls Logo

Huawei IPE Series - Installing the IPC on the Ceiling

Huawei IPE Series
92 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
IPE
Installation Guide
6 Installing an Infrared Dome IPC
Issue 03 (2013-02-28)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd
46
CAUTION
The protective film of the dome can be removed only after the installation is complete.
During the installation, ensure that the dome is clean. Do not touch the dome directly with
hands or other objects. Otherwise, the video quality is affected.
6.2.1 Installing the IPC on the Ceiling
You can install the IPC on the indoor ceiling or under a roof by using the white base or
directly through the black module base, as shown in Figure 6-1.
Figure 6-1 Installing the IPC on the ceiling
Installing the IPC on the Ceiling Using the White Lower Cover
Step 1 Use the T15 star L-wrench to loosen the three white star screws on the upper cover to open
the dome, as shown in Figure 6-2.
Figure 6-2 Opening the dome
Upper cover

Related product manuals