Preparing Signal Cables
线
4
EN
ZH
7
Power-On and Commissioning
EN
ZH
6
Installing Decorative Covers
Huawei Digital Power Technologies Co., Ltd.
Huawei Digital Power Antuoshan Headquarters, Futian
Shenzhen 518043, People's Republic of China
digitalpower.huawei.com
EN
EN
ZH
5
Electrical Connections
Scan the QR code for commissioning
instructions and other operations.
扫描二维码获取调测等详细指导。
EN
ZH
华为数字能源技术有限公司
深圳市福田区华为数字能源安托山基地
邮编:518043
digitalpower.huawei.com
ZH
调测
Commissioning
EN
ZH
拆除包装后,
24
小时内必须上电,否则重新包装,并放置到室内、干燥、无腐蚀性气体的环境中。
Power on the ESS within 24 hours after unpacking. If the ESS cannot be powered on
in time, put it in the original packaging and place it in a dry indoor environment
without corrosive gases.
EN
ZH
请拧紧螺母并确保胶塞压紧,否则会影响防水性能。
Tighten the nut and ensure that the rubber plug is pressed tightly. Otherwise, the
waterproof performance will be affected.